Setup Instructions for 12ft

Gazebo Assembly Instructions
12 Foot Rectangular Stand RT501 & 511

asmb12ftframe

Note: The 5-counter model is shown here. If your booth has only 3 counters, please disregard the side counter supports and VELCRO® brand fasteners on back section of each side

First-time Assembly:
Allow 30-60 minutes, power screwdriver with Phillips bit required

  • 1) Starting at one end, use rubber hammer to fully insert cross pieces into frame vertical assemblies (keep all snaps facing out, VELCRO® brand fastener pipe on top)
  • 2) Use power driver to insert screws on the underside of the fittings where shown by the (Gazebo Assembly) symbol. GLUING CROSS PIECES VOIDS WARRANTY
  • 3) Insert both notched pipes (A), with notch on top
  • 4) For easy transport, corner swivels fold in. If screws 1 – 4 are removed, frame becomes more compact

Booth Setup Once It Has Been Assembled:

  • 1) Unfold bottom frame into rectangle as shown with the snaps facing out
  • 2) Assemble valance frame, snap on valance vinyl
  • 3) Lift the valance frame, insert into frame sockets
  • 4) Snap skirt on, starting at one end
  • 5) Clip counter legs to front and sides of booth frame. Add upper and lower cross-pieces
  • 6) Align counters with VELCRO® brand fasteners and press down firmly
  • 7) Place optional undercounter shelves on bottom counter leg braces