Setup Instructions for 4ft

Gazebo Assembly Instructions
4 Foot Rectangular Stand RT401

First-time Assembly:
Allow 30-60 minutes, power screwdriver with Phillips bit required.

  • 1) Starting at one end, use rubber hammer to fully insert cross pieces into frame vertical assemblies (keep all snaps facing out, VELCRO® brand fastener pipe on top)
  • 2) Insert screws on the underside of the fittings where shown to secure the cross pieces. Use a power driver.
    GLUING CROSS PIECES VOIDS WARRANTY
  • 3) Insert both notched pipes (A), with notch on top
  • 4) For easy transport, corner swivels fold in.

Booth Setup:

  • 1) Unfold bottom frame into rectangle with snaps facing out
  • 2) Assemble valance frame, snap on valance vinyl
  • 3) Lift the valance frame, insert into frame sockets
  • 4) Snap skirt on, starting at one end
  • 5) Clip counter legs to frame. Attach counter support cross braces.
  • 6) Align counters over VELCRO® brand fasteners and press down firmly to secure.
  • 7) Place optional undercounter shelf on bottom counter leg braces.

asmb4ftframe